“Katy Perry – Firework” Breakdown

This entry is part 4 of 13 in the series Dave's Breakdown

I don’t know if it’s just me or not but Katy Perry’s Firework song is strange.  Not only does comparing yourself to a 2-second burst of light that is simply forgotten (honestly, do you remember every firework you’ve seen?) a terrible way to try and influence teenage girls into having self-esteem about themselves or whatever, but there’s a completely different way to look at this song.

It’s about a huge penis.  A penis that Katy Perry is sucking and is blowing its load all over her face.  To make my point clear, I’ll point out all the parts of the song where it can be taken as such in this edition of Dave’s Breakdown.

–

“Do you ever feel/Like a plastic bag/Drifting through the wind/Wanting to start again“

Obviously this “plastic bag” is a condom.  The guy that Katy Perry is blowing has blown his load already and Katy Perry has slapped off this condom so she can get the full taste.  She “wants to start again,” after all.

“Do you ever feel/Feel so paper-thin/Like a house of cards/One blow from caving in”

They’ve been at it for so long that both parties are simply exhausted, however they’re still going to go at it cause Katy Perry has a huge rack and its impossible to get unhorny during sex with her.  So, one more “blow” and they’re about to cave in and pass out from exhaustion.

“Do you ever feel/Already buried deep/Six feet under/Screams but no one seems to hear a thing”

Six feet under buried under a mountain of cum, it seems like.  “Screams” because she’s orgasmed like 15 times already.

“Do you know that there’s/Still a chance for you/‘Cause there’s a spark in you/You just gotta”

Even though they’ve had sex like 15 times already, there’s still a little bit of cum inside this penis.  Gotta make it 16, after all.

“Ignite the light/And let it shine/Just own the night/Like the Fourth of July”

“The light” being the huge penis, of course.  Let it shine, like sunlight in your face.

“‘Cause baby, you’re a firework/Come on show them what you’re worth/Make them go, “Oh, oh, oh”/As you shoot across the sky”

Cause the penis is like a firework and is exploding across Katy Perry’s face.  Obviously she’s going “oh oh oh” cause she’s having sex, and once the guy is about to cum she takes the penis out of her mouth and then the cum shoots across the sky, onto her face.

“Baby, you’re a firework/Come on let your colors burst/Make them go, “Oh, oh, oh”/You’re gonna leave before they know”

So, we know this guy is a firework cause he’s blowing up.  And his “colors bursting” is obviously his oddly colored semen.  And he’s gonna leave before someone knows he was there because they shouldn’t be doing what they’re doing (uh oh!)

“You don’t have to feel/Like a waste of space/You’re original/Cannot be replaced”

Basically this means this huge penis is so nice and big that she could never want another.

“If you only knew/What the future holds/After a hurricane/Comes a rainbow”

The hurricane is in Katy Perry’s vagina with a huge penis storm.  After that, a rainbow from this guy’s penis into Katy Perry’s mouth, like a pot of gold at the end of the rainbow.

“Maybe the reason why/All the doors are closed/So you could open one/That leads you to the perfect …”

So I guess they closed all the doors so no one would see them fucking, and the only one open is the bathroom so they can have sex in the shower too.  And that is probably the preferred method of sex for her since it “leads you to the perfect.”

“Like a lightning bolt/Your heart will glow/And when it’s time you know/You just gotta”

Meaning you just gotta cum on her face.

“Ignite the light/And let it shine/Just own the night/Like the Fourth of July”

“Turn on the light, I want to see the huge penis in the light now, and just fuck me like you did on July 4”

“Boom, boom, boom”

This is the penis slapping into Katy Perry’s vagina hole and/or mouth.  Maybe ass, if she’s into that.

“Even brighter than the moon, moon, moon”

It’s bright because it got into her eye and she can’t see anything but white.

“It’s always been inside of you, you, you/And now it’s time to let it through”

“It” being the cum and its coming out and onto her face.

–

In conclusion Katy Perry has a huge rack and everything she sings is about sex.

Series Navigation“Is Our Health On the Line?” Breakdown“List of 10 Things” Breakdown

3 thoughts on ““Katy Perry – Firework” Breakdown”

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.